Siren
Meeting Room Render
Siren
Meeting Room
Siren
Phone Booths
Siren
Meeting Room

Galway, H91

Acoustic Fit-Out Case Study: Siren Headquarters

Requirements:

Siren required a comprehensive acoustic and AV solution to optimize the functionality of their Boardroom and Phone Booths. Key requirements included:

  • Achieving specified Reverberation Time (Tmf) targets for improved acoustic performance.
  • Seamless integration of wall-mounted sound-absorbing finishes that complement the aesthetic of the spaces.
  • Installation of advanced video conferencing hardware in the Boardroom.
  • Effective sealing of doors to minimize sound leakage.
  • Post-installation acoustic testing to ensure the design meets performance benchmarks.

Analysis of Requirements:

  1. Acoustic Challenges:
    • Spaces such as the Boardroom and Phone Booths required precise acoustic treatment to reduce reverberation and improve clarity.
    • Achieving the desired acoustic performance while maintaining the visual appeal of the spaces was critical.
  2. Video Conferencing Needs:
    • The Boardroom required a state-of-the-art video conferencing system with advanced features such as AI-assisted audio optimization, high-resolution video, and multi-platform compatibility.
  3. Door Soundproofing:
    • Effective door seals were necessary to prevent sound leakage, ensuring privacy and enhanced acoustic performance.
  4. Compliance with Standards:
    • Post-installation acoustic testing had to comply with ISO 3382-2 standards, ensuring the results met international benchmarks.

Solution:

1. Design Works:

  • Developed 3D Room Acoustic Models for the Boardroom and Phone Booths using ODEON Room Acoustic Modeling software. This enabled precise specification and placement of wall-mounted sound-absorbing finishes.
  • Predicted and iteratively refined the Reverberation Time (Tmf) to ensure the spaces met the acoustic targets.
  • Prepared material layout drawings for client approval, ensuring the finishes aligned with Siren’s aesthetic requirements.

2. Acoustic Installation:

  • Door Seals:
    • Installed head, jamb, and drop seals for doors in the Boardroom and Phone Booths. The seals were colour-matched to the door frames for seamless integration.
  • Room Acoustic Finishes:
    • Boardroom:
      • Side Wall and Screen Wall: Installed Artnovion Myriad AE panels (colours chosen in consultation with the client).
      • Back Wall: Installed Artnovion Mirage panels with a custom Siren logo graphic. Fixtures were relocated or integrated as needed.
    • Phone Booths 1, 2, and 3: Installed Artnovion Mirage panels on the back wall, ceiling, and side walls.

3. Video Conference Hardware Installation and Integration:

  • Installed the DTEN D7X 55” system in the Boardroom, integrated with the existing network over Cat6 connectivity.
  • Key Features:
    • 4K camera with a 129° viewing angle and auto-framing.
    • AI-assisted audio optimization and echo cancellation.
    • 15-microphone array for clear and focused speech.
    • Multi-platform compatibility with Zoom, Microsoft Teams, and more.
    • BYOD functionality for easy screen sharing via USB Type-C.

4. Acoustic Commissioning Testing:

  • Conducted post-installation testing to verify that the achieved Reverberation Time (Tmf) met the target requirements.
  • Issued a detailed report in compliance with ISO 3382-2 standards, documenting the acoustic performance results.

Conclusion:

The tailored acoustic and AV solutions provided by Allegro Acoustics significantly enhanced the functionality and usability of Siren’s spaces.

  • Acoustic Performance: The Boardroom and Phone Booths achieved the specified Reverberation Time (Tmf) targets, ensuring optimal clarity and sound quality.
  • Aesthetic Integration: The installed acoustic finishes complemented the design of the spaces while meeting performance goals.
  • Client Satisfaction: Siren expressed high satisfaction with the solutions provided, praising the improved acoustic environment and the advanced video conferencing capabilities.
  • Ease of Use: The intuitive design of the DTEN D7X ensured a minimal learning curve, making it easy for employees to adopt the new system.

Client

Services

Completion

2023

Standards Achieved

- CISCO PROJECT WORKPLACE (2015)
- AS NZS 2107 Acoustics (2016)

Looking for support on your next project?

Scroll to Top